CER is participating with our brand ABKessel in the new manufacturing plant in Turkey

Based in the highly sophisticated 15,384,238 m2 industrial complex developing in the outskirts of Ankara, we are in the advanced stages of the construction of the new state-of-the-art boilers manufacturing plant to be completed by the end of 2021.

The new plant will be an addition to our already existing ABKessel factory, and it has proven indispensable to meet our increased demand for biomass and waste-to-energy boilers for covering the energy needs in the industrial and manufacturing sectors and for District Heating, in both the private and public sectors.

The plant will be producing tailored boilers, with specific requirements in terms of destined use, capacity and fuel used. The planned capacity of the boilers will range from 0,5 MW to 10MW. However, intense research and studies on boiler design are underway to determine the possibility of the delivery of boilers with even greater energy capacity.

An important element of the new facility is a production machinery line that will be manufacturing water tube boilers for Energy Plants.

However, the great innovation of the future plant is the planned separated boiler room that will be used as a test center.  A moving grate boiler will be installed and equipped with all measuring devices which will be able to test customer fuels.

The industrial zone where the plant is located has a total of 321 parcels ready for use for the most diverse industries. This greatly increases the chances to have suppliers and partners in the same area, which is going to be an important advantage in terms of a faster and much more economic supply of raw materials.

In addition to that, the area will be directly connected to a modern railway network for international transport of containers and heavy loads, planned by the Turkish goverment. This will make for a seamless, fast and economic delivery of our finished products anywhere on the European and Asian continent.